Monday, June 25, 2012

Demo progress



The elevated floor and most of the walls in the bathroom have been removed. We found that there was a continuous piece of linoleum under the entire space, and the bathroom was just added on top.  This is good news, since we can now build the bathroom level with the rest of the hall area. The bad news is that we have to do some additional demo to rip out more floor.

No comments:

LinkWithin

Related Posts with Thumbnails